Use Projects in 3PM Estimator to create a Project, keep its estimates together, and begin a New estimate. You can add a Project with a name and an optional location, return to it later, and add as many estimates as you need.
Getting there
Open Projects from your 3PM Estimator workspace. The Projects page shows your Projects, the number of estimates in each one, the latest estimate total when available, and the Project location when one has been added.
To create a Project, select Add project. To return to the complete list after using a status filter or an empty state, select Show all projects.
Key concepts
- A Project is the container for a construction job. Its name and location are shared across the work you organize there.
- An estimate belongs to one Project. A Project can hold multiple estimates, so you can keep different options or pricing attempts side by side rather than replacing one with another.
- A Project location is optional. When provided, it grounds regional labour and material pricing and selects the GST rate from the country where the work is located. Without a location, regional pricing and the GST rate use your workspace defaults.
- The Project list shows the latest estimate total, not a combined total of every estimate in the Project.
- A Project with no estimates shows No estimates. Open it to start a New estimate.
How to Add project
- Open Projects and select Add project.
- In Project name, enter the name for the job. This is required.
- In Project location, optionally search for and select the address. You can also enter a location as text. The location is shared by every estimate in this Project.
- Select Continue.
- 3PM Estimator opens New estimate for the Project you just created. Continue there to describe the work and create the first estimate.
How to open a Project
- Open Projects.
- Select the Project card you want to view.
- On the Project page, review its location and estimates. Select an estimate to open it, or select New estimate to add another one.
If the Project has no estimates yet, select New estimate in the empty state. Existing estimates remain together in the Project when you add another one.
How to start a New estimate
- Open Projects and select the Project you want to price.
- Select New estimate.
- In Estimate name, enter a label for this estimate, such as “Base scheme” or “Value engineered”.
- In Scope, describe the project scope, size, structure, finishes, timeline, and anything else the estimate should account for. Scope is required.
- In Documents, attach plans, drawings, specifications, or a scope sheet if you have them.
- Choose an Estimate format.
- Choose the Model if you want to change the selected option.
- Select Create estimate. 3PM Estimator creates the estimate and opens its workspace.
When you create the first estimate immediately after adding a Project, the form shows the Project and Estimate steps. When you add another estimate from an existing Project, you go directly to the estimate form.
Tips & things to know
- Give each Project a clear, recognizable name so it is easy to find in Projects.
- Add the Project location when you know it. It helps 3PM Estimator apply regional labour and material pricing and the relevant GST rate consistently across the Project’s estimates.
- Attach the drawings and specifications that apply to a particular estimate. Documents belong to that estimate, so different estimates in the same Project can use different drawing sets.
- Use separate estimates for alternatives, value engineering, or later re-pricing. They stay side by side in the Project.
- Only an Owner or Admin can delete a Project. Deleting a Project also deletes every estimate under it, including its priced lines, chat history, and uploaded drawings or specifications. You must type the Project name to confirm, and the action cannot be undone.
Warning: Deleting a Project permanently removes the Project and all estimates under it. Check that you have selected the right Project before confirming.
FAQ
Can I add more than one estimate to a Project?
Yes. Open the Project and select New estimate. Each estimate stays in the Project alongside the others.
Is a Project location required?
No. Project location is optional. If you do not add one, regional pricing and the GST rate use your workspace defaults.
Can each estimate have different Documents?
Yes. Documents belong to the estimate where you attach them. This lets you price different drawing sets or scope options within the same Project.
What is required to create a Project?
You must enter a value in Project name. Project location is optional.
What is required to create a New estimate?
You must enter a description in Scope. You can also provide an Estimate name, attach Documents, choose an Estimate format, and select a Model before choosing Create estimate.
Why can’t I delete a Project?
Project deletion is available only to workspace Owner and Admin roles. If you have one of those roles, select the delete control for the Project, type its name when prompted, and choose Delete project.
Can I undo deleting a Project?
No. Deleting a Project and its estimates cannot be undone.
