3PM Estimator helps you create faster, clearer construction estimates, manage Projects, review Estimate results, and use Benchmarks across your workspace. Use this glossary to understand the terms you see in 3PM Estimator.
Terms and definitions
- Estimate: A priced version of a job, built from a project scope and any Documents you provide. A Project can contain more than one Estimate.
- Project: The job record that groups its scope, Documents, and Estimates.
- Quote: The client-facing reading of an Estimate. It presents the Estimate in the selected Estimate format.
- Elemental: The cost-analysis reading of the same Estimate. It organizes pricing for construction cost review and comparison.
- Benchmarks: The workspace area for building and comparing reference cost bases for a region and building type.
- Cost basis: The saved reference set used by Benchmarks for a particular market and facility type.
- Unit cost: A cost expressed against an area unit, such as square feet or square metres.
- Direct cost: The starting cost before standard adjustments are added.
- Standard adjustments: The percentage additions applied to direct cost: Preliminaries & General, Overhead, Contingency, and Margin.
- GST-exclusive: An amount shown before GST is added. Estimate totals are displayed this way when the screen identifies them as GST-exclusive.
- Scope: Your description of the work, including details such as size, structure, finishes, and timeline.
- Estimate format: The structure used for an Estimate. It is selected when you create an Estimate and stays fixed for that Estimate.
Quote and Elemental
Open an Estimate to switch between Quote and Elemental. Both are different readings of the same Estimate and use the same underlying line items, so their totals remain aligned.
Quote is the document-style view for presenting the scope, sections, groups, lines, quantities, units, rates, and totals. Use it when you want to review how the Estimate reads as a client-facing document.
Elemental is the cost-analysis view. Use it to review how costs are distributed across construction elements and to compare the Estimate with a cost basis.
An Estimate can show its region, basis date, gross area, storeys, building type, project type, sections, and lines. Its total is shown excluding GST, with a cost-per-area figure when enough area and pricing information is available.
You can also edit an Estimate when editing is available. Select Edit, change supported line details, then select Save. Select Cancel to discard changes. A line must have a description. If an AI update is in progress, editing and some other actions may be unavailable until the update finishes.
Projects and Estimate
Select Projects to view and manage your jobs. A Project can hold multiple Estimates, allowing you to price different options or drawing sets without changing the Project itself.
To create an Estimate:
- Open a Project and choose the option to create an Estimate.
- Enter an Estimate name.
- Describe the Scope. A Scope is required.
- Add Documents such as plans, drawings, specifications, or a scope sheet if they are relevant.
- Choose an Estimate format.
- Choose a Model if you want to use a different option from the preselected choice.
- Select Create estimate.
Documents belong to the Estimate you add them to. This means you can use a different drawing set for another Estimate in the same Project.
The Estimate format is fixed once the Estimate exists. Settings can provide the initial defaults for new Estimates, but changing those defaults does not change existing Estimates.
Dashboard and Benchmarks
Select Overview to open the Dashboard. The Dashboard gives you a workspace-level view of your recent estimating activity and areas that may need attention. Use it as a starting point, then open Projects, Benchmarks, or a specific Estimate for detail.
Select Benchmarks to build or review reference unit costs for a market and facility type. A cost basis includes a region, basis date, area unit, currency, building type, and priced elements. Each rate is shown as a low–typical–high band.
To use a cost basis:
- Select Build a cost basis.
- Provide the requested market and facility details.
- Review the generated reference unit costs.
- Select an Estimate in Compare to see how its pricing measures up against the selected cost basis.
Only Estimates with a priced total can be compared. Benchmarks are AI-generated reference figures for checking your pricing; they are not a substitute for a subscription cost service or local quotes.
Note: Treat cost-basis figures as a sanity check. Confirm rates against your own project information, suppliers, subcontractors, and current local pricing.
Profile, Settings, and Team
Profile
Select Profile from your user menu to manage how you appear in 3PM Estimator.
- First name and Last name control the name displayed in 3PM Estimator.
- Email is your sign-in address and cannot be changed here.
- Save changes applies a name update.
- Reset to my 3PM name removes a local name change and returns to your 3PM name when that option is available.
Your Profile name is separate from workspace membership and does not change the email used to sign in.
Settings
Select Settings to manage workspace and estimating preferences. Depending on your access, you may see these tabs:
- Workspace: Workspace details and preferences.
- Estimating: Defaults used when new Estimates are created.
- Integrations: Available connected services.
- Danger zone: Destructive workspace actions.
In Estimating, you can set:
- Default model: The preselected Model on the Estimate form.
- Default estimate format: The preselected format for new Estimates.
- Currency: The three-letter currency code used for pricing.
- Cost-basis region: The region used when a Project has no address and when a cost basis is selected in Benchmarks.
- Area unit: The unit used for cost-per-area figures: square feet or square metres.
- GST rate: The GST percentage applied on top of the GST-exclusive total.
- Standard adjustments: Preliminaries & General, Overhead, Contingency, and Margin. Each is entered as a percentage of direct cost.
- House pricing rules: Notes handed to the estimating assistant with every Estimate, such as labour rates, preferred subcontractors, or regular exclusions.
Each standard adjustment and the GST rate must be between 0 and 100 percent. Select Save defaults to apply changes to new Estimates. Existing Estimates are unchanged.
Team
Select Team to view workspace members and manage invitations when you have permission.
Select Invite member, enter their Work email, choose a Role, and select Send invitation. An invitation gives the person access to the workspace. One 3PM account covers every app in the suite.
The available roles are:
- Owner: Full control, including deleting the workspace and managing owners.
- Admin: Can manage members, invitations, and estimating defaults.
- Member: Can create and edit Estimates.
Owners and Admins can manage workspace members and invitations. An Admin cannot manage an Owner. The last Owner cannot be removed or demoted, so ownership must be transferred first.
To remove a member, open the member's actions, choose Remove from workspace, review the confirmation, and select Remove member. Removing someone takes away their access immediately. Estimates they created remain in the workspace because Projects belong to the workspace, not to their author.