3PM Estimate helps you turn a project brief, drawings and specifications into a clearer construction estimate. Use Quote to read the estimate as a structured document, switch to Elemental to review cost by part of the building, and use Benchmarks to compare priced estimates with reference costs for a market and facility type.
What 3PM Estimate does
Start with a Project and describe the scope, location and size. You can attach plans, drawings, specifications, a scope sheet or other project documents. 3PM Estimate uses this information to build an itemised Estimate with quantities, units and rates.
The estimate is built in the estimate workspace, where you can:
- Read the result in Quote or Elemental.
- Follow progress while the estimate is being built.
- Ask for changes in the conversation beside the estimate.
- Review sections, groups, line items, quantities and totals.
- Edit an estimate when editing is available, then save or cancel your changes.
- Export a client-facing PDF, an internal PDF or an Excel workbook when you are ready.
Estimates use your workspace settings, including your currency, region, area unit and estimating percentages. Costs are presented GST-exclusive, with GST shown separately where applicable.
Key concepts
Project
A Project is the home for the project information and its Estimates. A Project can contain more than one Estimate, so you can keep alternatives such as a base scheme and a value-engineered option together.
Estimate
An Estimate is the priced result created from a scope and its Documents. It can be in Draft, Estimating, Ready or Error status. An Estimate format is selected when you create it and stays fixed for that Estimate.
Quote
Quote is the document view organized for the reader of the quote. It groups priced work into sections and packages so the scope can be read in the way a construction quote is normally presented.
Elemental
Elemental is the cost-planning view organized by what each part of the building does, rather than by trade or material. For example, cladding, insulation, sealant and coating can be read together under External walls. Quote and Elemental use the same priced lines and therefore produce the same totals.
Benchmarks
Benchmarks provides reference unit costs for a region and building type. A reference cost basis contains low, typical and high ranges rather than one supposedly exact market rate. You can compare a priced Estimate with a basis line by line, by element and by cost per area.
A reference cost basis belongs to the current workspace. Building a basis for a region and building type that already exists replaces the existing basis.
How to use Quote
- Open Projects and select an existing Project, or create a Project from the Overview screen.
- Add an Estimate to the Project.
- Enter an Estimate name and describe the Scope. Include the building type, size, structure, finishes, timeline and any assumptions you want considered.
- Add Documents such as plans, drawings, specifications or a scope sheet.
- Select an Estimate format, choose the Model if needed, and create the Estimate.
- Watch the estimate build in the estimate workspace. Use the conversation to ask for clarification or changes.
- In the estimate panel, choose Quote to review the client-readable grouping.
- Check the sections, packages, quantities, line amounts and totals. Review any Preliminaries, Contingency or Cancelled sections carefully.
- Use the available export option when you need to share the result or continue working with the line items.
Quote is useful when you want to understand how the work is packaged for a client or when you are checking that the document follows the structure you selected.
Tip: Describe assumptions in the Scope before creating the Estimate. A clear brief gives the estimate more useful context to work from.
How to use Elemental
- Open a ready or priced Estimate in its estimate workspace.
- Select Elemental in the estimate panel.
- Review the cost grouped by building element, such as Substructure, Roof, External walls, Internal walls, Floor finishes or Services.
- Compare the element totals with the corresponding scope in Quote. The grouping changes, but the underlying priced lines and overall total do not.
- Open Benchmarks to compare the Estimate with a reference cost basis for the relevant region and building type.
- Review whether each matched element is within, above or below its reference range, and look at the difference across the floor area.
Elemental is useful for checking whether the cost distribution makes sense, comparing estimates consistently and reviewing cost against published or workspace reference data.
Only priced Estimates can be compared with Benchmarks. If an Estimate is still being built or has no priced total, select it after pricing is complete.
Where to go next
- Go to Projects to create a Project, add an Estimate or open an existing estimate.
- Go to Benchmarks to build a reference cost basis or compare a priced Estimate.
- Go to Settings to review the currency, region, area unit and estimating defaults used for future Estimates.
- Go to Team to manage the people who use the workspace.
- Return to Overview to see project activity and estimating summaries.
FAQ
What is the difference between Quote and Elemental?
Quote groups the same priced lines into the document structure used for reading and sharing a quote. Elemental groups those lines by the function or part of the building. They are two readings of the same Estimate and have the same total.
Does Elemental replace Quote?
No. Use Quote when you need to review the quote structure or prepare a client-facing document. Use Elemental when you need to analyze cost by building element or compare the Estimate with Benchmarks.
Can I change the Estimate format later?
No. The Estimate format is fixed once the Estimate is created. Create another Estimate in the Project if you need to assess the same scope in a different format.
Can I compare an unfinished Estimate with Benchmarks?
No. Benchmarks compares priced Estimates. Finish building the Estimate and make sure it has a priced total before selecting it for comparison.
What happens when I build the same reference cost basis again?
A basis for the same region and building type replaces the existing basis. This keeps one current basis for that combination rather than creating competing versions.
Why might a line not match a Benchmark?
Matching is conservative. The unit must agree, and the element, reference code or description must align. A line that cannot be matched is not given a misleading comparison.
Are rates included in the client-facing PDF?
The client-facing view is designed to show the quote without internal rates. Use the internal PDF or Excel workbook when you need the full cost build-up for your team.